Brazil's CSN halts No2 blast furnace on weak demand

June 02, 2020 / www.metalbulletin.com / Article Link

Brazilian flat and long steel producer Companhia Sider??rgica Nacional (CSN) has halted the No2 blast furnace at its Usina Presidente Vargas (UPV) unit, aiming to adapt its steel production to weak demand conditions, the company said late on Friday May 29.

The affected equipment has capacity for 1.50 million tonnes of crude steel per year. CSN did not say how long the stoppage will last.

In mid-May, several sources said the company had started procedures to halt...

Recent News

Canada second most significant player in global mining M&A

July 22, 2024 / www.canadianminingreport.com

Plenty of potential for continued rotation out of tech

July 22, 2024 / www.canadianminingreport.com

Platinum to palladium ratio low, platinum to gold high, versus history

July 15, 2024 / www.canadianminingreport.com

Gold stocks up on metal and equities gains

July 15, 2024 / www.canadianminingreport.com

Most major metals rebound on potential global monetary easing

July 09, 2024 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok