AT A GLANCE: Glencore cuts Q3 coal production guidelines

October 31, 2020 / www.metalbulletin.com / Article Link

A summary of Glencore's 2020 third-quarter production report for the coal sector, released on Friday October 30, where the company maintained its 2020 full-year production guidance except coal, which was adjusted for the extended strike at the Cerrejon mine.

In brief The company's year-to-date (YTD) coal production of 83.5 million tonnes was 20.5 million tonnes or 20% lower than the comparable prior-year period due to the Prodeco mines in Colombia being on care and maintenance for most of 2020, disruptions at the Cerrejon mine - which were initially Covid-related but have lately been due to industrial action - and the reduction in targeted second half-year 2020 volumes across the Australian portfolio amid weak market conditions. Australian...

Recent News

Canada second most significant player in global mining M&A

July 22, 2024 / www.canadianminingreport.com

Plenty of potential for continued rotation out of tech

July 22, 2024 / www.canadianminingreport.com

Platinum to palladium ratio low, platinum to gold high, versus history

July 15, 2024 / www.canadianminingreport.com

Gold stocks up on metal and equities gains

July 15, 2024 / www.canadianminingreport.com

Most major metals rebound on potential global monetary easing

July 09, 2024 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok